OEM / ODM partnerships

Bring Your Furniture Brief into Focus

Connect product design, development and manufacturing with a Taiwan-based furniture partner. Start with the function, market and specification your project needs.

Two starting points

A Collection to Adapt. A Concept to Develop.

OASYS develops office and home furniture collections and works with global brands through OEM / ODM partnerships. The right approach depends on how much of the product is already defined and what needs to be developed.

Build on an Existing Series

Start with a model whose structure and functions suit your application. Review the available mechanisms, support features, base, upholstery, colours and accessories to establish a configuration.

Useful starting material: series name, required options, quantity, destination and any branding or packaging requirements.

Explore Product Specifications →

Develop a Product Brief

Start with the user, application and design intent. A clear brief helps connect appearance and ergonomics with structure, materials, component selection and manufacturing feasibility.

Useful starting material: drawings or references, essential functions, target dimensions, market requirements and expected volume.

Discuss a Development Project →

Development checkpoints

Turn Decisions into a Clear Specification

Use these checkpoints to structure the discussion from first enquiry to production. The sequence and scope should be agreed around the complexity of your project.

02

Review Design & Feasibility

Consider ergonomics, materials, structure, mechanism and manufacturing together. Discuss which existing components can be used and which details require development, tooling or a different specification.

03

Evaluate the Sample

Use a sample to examine function, dimensions, appearance, materials and assembly. Record feedback against the agreed brief so refinements are specific and the next revision has clear evaluation criteria.

04

Confirm the Specification

Align drawings, components, finishes, approved sample details and any required testing. Packaging, instructions, labelling and destination requirements also belong in the final specification.

05

Plan Production

Confirm the order conditions, production schedule, inspection requirements and packaging before volume manufacture. New tooling, material availability and specification changes can affect the plan.

06

Coordinate Delivery

Agree the shipping arrangement and document requirements for the destination. Identify product and configuration details that should accompany installation, care or any subsequent parts enquiry.

Configuration decisions

Balance Function, Finish and Production

Changing a colour is different from changing a structure. Define how each requested option affects the user experience, component compatibility and evaluation requirements.

For example, task seating may involve mechanism and support choices, while a flexible training chair may require folding, nesting, mobility or a writing tablet. Availability and combinations need to be confirmed for the chosen model.

Send a Brief We Can Work With

  • Product category, intended users and room or work context.
  • Essential functions, dimensions, drawings and reference images.
  • Material, colour, branding and packaging preferences.
  • Destination market and required standards or documentation.
  • Expected quantity, repeat-order expectations and required timing.
  • Sample evaluation criteria and the decisions already approved.
Start an OEM / ODM Enquiry →

APPROVAL CHECKPOINTS

Agree What Each Approval Covers

A useful development discussion connects each decision with a record. Agree which documents and samples are needed for the scope of your project.

Product Brief

Record the intended user, application, target market, essential functions and expected quantity. Distinguish fixed requirements from options still being explored.

Sample Review

Record the configuration, drawings, material references, photographs and feedback. Identify accepted details and any revisions needed before approval.

Production Specification

Align the approved model and options with the order, required documents, packaging and delivery arrangements. Clarify responsibilities for any remaining decisions.

FREQUENTLY ASKED QUESTIONS

Planning a Development Project

Detailed questions make the scope easier to evaluate and the quotation more useful.

How do I know whether to start with a standard model or a new design?

Start with an existing series when its structure and core functions already meet your brief. List any changes to finishes, components or accessories and confirm their availability. A concept with new dimensions, a different mechanism or a new structural arrangement needs a broader discussion of design, feasibility, tooling and evaluation. Reference drawings and a clear list of essential functions make that discussion more productive.

Which customisation decisions can affect cost or lead time?

A material or colour change may involve sourcing, minimum quantities and finish approval. Changes to moulded parts, metal geometry or component interfaces can add development, tooling and sample work. Branding, instructions and packaging also need to be specified. Identify each change separately so its effect can be assessed rather than treating all customisation as one item.

What should we evaluate before approving a sample?

Review appearance, dimensions, support, adjustments, stability and assembly against the project brief. Include the actual materials and components where these affect the decision. Record the approved configuration, open issues and required changes in writing. A visually approved sample should also be aligned with any testing or documentation needed for the destination market.

How should we discuss minimum quantities and production timing?

Include the model, configuration, expected order volume and requested delivery date in the enquiry. Existing components and a new development project can have different requirements. Sample revisions, tooling, material availability, testing and packaging can all affect readiness for production. Quantity and timing should be confirmed for the agreed scope rather than assumed from another product or order.

What needs to be agreed before moving from sampling to volume production?

Align the product specification, approved sample details, finishes, component choices and acceptance requirements. Confirm the quantity, order conditions, packaging, labels, instructions and delivery arrangement. If a requirement changes after approval, identify which documents, samples or evaluation results need to be reviewed again before production proceeds.

Your next product

Start with the Requirements That Matter

Share the application, essential functions, target market and expected volume. A focused brief is the first step towards a useful technical and commercial discussion.

Discuss Your Project →
Scroll to Top